Sod Installation Process
After measuring your area and preparing the soil, it’s time to lay the sod:
Straight Lines & Stagger: Begin with a straight line, even if it overlaps concrete or other landscaping features. Lay the sod in a brick-wall pattern, ensuring no gaps and tightly fitting pieces.
Cut Excess: After laying each row, use a sharp knife or shovel to trim excess and use the remaining pieces to fill any gaps.
Water: Immediately water the sod after installation. You’ve applied enough water if it squirts between your toes when you walk across it. The soil underneath should be muddy. Continue watering twice a day for 7-10 days until the sod roots into the soil.
Fertilize: After the sod has “tacked in” and the roots are established, decrease watering to a few times a week and make sure to fertilize as part of maintaining your lawn.
No Seeding
We don’t recommend seeding with low-growing turf seed, as it often won’t germinate and may wash away due to rain or irrigation.